|
Other Inside Projects
*********************************************************************
"Over My Head" Finished Instalation of engineered flooring to cut out around vents and cabinets
***********************************************************************
The need for out of the way storage was solved after realizing there was space behind that wall.
First we had to move a couple of plugs and a phone jack, then it was time to cut.
The cabinet is 4 feet deep, and nearly 8 feet wide, the doors are solid Alder wood laminated. They sit in a groove and are held in position by 2 super duty magnetic closures each.
On the left, see a close up of the lower groove. The owners painted and installed floor tiles, they also did the staining of the doors. You can see how convenient the access is with the doors moved aside.
*********************************************************************************
I ran the stove pipe, Gas Line (Flex) and thermostat, the special vent on the outside of the house.
After Finishing and paint, I hooked up the gas stove.
*********************************************************************************
(End of Page)
|